March 5, 2009

 

All,

News of Today:

 

- At Lake E, temperatures went down to -37C, but a sunny and mostly calm day brought us much closer to the start of coring.

- Last night the truck with the casing and the truck with the 2nd AWI container (with wood for the core boxes, mud etc.) arrived; the casing was already put on the rack at the platform, and the mud was stored in one of the empty containers close by.

- At site D2, some technical problems with heaters have been solved. The rig was heated up and a test start was successful.

- If weather allows (the wind just is catching up), the rig will be positioned on the platform tomorrow.

 

Cheers

Martin