February 20, 2009

 

All,

News of Today (based on Email from Olaf and calls with Olaf and Catalina)

- At Lake E the wind during the day ceased, and the sun even showed up.

- Despite these good conditions not much heavy equipment work was possible to be conducted, since both the Dozer and the Wesdechot left the camp tp help the remaining trucks over the mountains. They currently are 20 km away from the camp, so that their arrival is expected during the night or morning.

- Once this freight is in the camp everything should be available to complete the construction of the drilling platform and set up the rig.

 

Cheers for now

Martin